Project Profile
The project covers a total area of 75 mu, of which the first-stage is about 34 mu. The project will be franchised by BOT contract for 25 years (including construction time). It is designed by The Central South Design and Research Institute of China Municipal Engineering. The total scale is 15,000 tons/day.