E-mail: global@techase.com

Huzhou River Silt Treatment Project

Project Profile
The project dredged 30,000m³ of silt with a total length of 4,186m. The treatment effect is to reduce the silt content to 11250m and the moisture content ≤60%.

  • Contact Us
  • Fax: +86-21-65988179
  • Tel: +86-21-55806316
  • Add: 3rd Floor, Tongji Science & Technology Building, No.1121 North Zhongshan No.2 Rd, Shanghai, China
Links
College of Environmental Science & Technology

Tongji Environmental Consulting

Shanghai Engineering Search Center of Sludge Treatment & Resource Utilization High Tech Equipment

E-mail:


global@techase.com


Copyright TECHASE ENVIRONMENT  备案号:沪ICP备09021892
扫一扫咨询微信客服